March Hares, Hindhead

Private development

TALO ultra-low energy home to a completely bespoke design



Key Facts:



Developer:                Private client
Main contractor:     Oakmont Contracting
Architects:                C7 Architects

Energy rating:          
EPC A

The Project


This five-bedroom, 3000sqft residential new build for a private client was a replacement dwelling built on the same footprint as a 1970s bungalow.

The client had originally planned to refurbish and vertically extend the existing home with an additional floor. However the cost and timescale required were way in excess of what could be achieved with TALO.

By using the TALO package of solutions, the client could benefit from a new ultra-low energy home to a completely bespoke design and for a cost reduction of 30 per cent compared to the budget needed for the traditional refurbishment and extension.

The build programme could also be reduced by two thirds, from nine months to just three months, from foundations to occupation.


The ‘Whole House’ Solution

This home was built using TALO’s highly insulated timber superstructure. The panelised system was manufactured offsite and pre-fitted with timber cladding, plasterboarding, insulation and triple glazed windows for faster, more accurate and more efficient installation on site.

This improved the build quality and ensured a high level of air tightness to reduce heat loss and energy consumption.
The superstructure was combined with TALO’s lightweight foundation system which reduces cost and waste to landfill.

The third element of TALO’s solution was the energy strategy. The new home has 16 solar panels and battery storage to power electric underfloor heating for the ground floor and bathrooms, together with mechanical ventilation and heat recovery (MVHR) to create a healthier internal living environment.


Fast-track Installation – A Watertight Home in just Four Days

This large 280sqm property went from foundations to watertight in just four days, ready for the fast-track fitout by main contractor Oakmont.

The speed of construction allowed fitting out to begin at an earlier stage and the client to take occupation in just three months. 


Test results that exceeds Passivhaus Energy Standards

This EPC A rated home is the latest TALO project to achieve outstanding air pressure test results – 0.58 m3/hr/m2 – which are well below the maximum requirements of 8m3/hr/m2 set out in Building Regulations Part L1a and L2a (England and Wales).

These results exceed the more stringent Passivhaus energy standards and the new Future Homes Standard.

TALO’s dry timber approach – from forest, sawmill, factory and to site – and the use of robust offsite manufacturing processes combine to significantly reduce air permeability and consistently achieve exceptional test results and at no cost premium.
This means significantly lower energy costs for the homeowner.


Bespoke Architectural Design for a Woodland Setting

The design for March Hares by C7 Architects helps the building blend into its semi-rural, woodland valley location. Internally, the home has an open plan layout and a double height entrance hall.

The factory-installed timber cladding is finished in warm grey with accents of black to the feature gable ends, window surrounds, porches and canopies to the rear and front of the house. The recessed windows were finished in dark grey.

Customer Insight

Matt Glasgow, Client

The decision to demolish the original bungalow and build a new ultra-low energy home in its place using TALO’s solutions proved to be absolutely right, both financially and in terms of our wider outcomes and vision for the project.
The refurbishment and extension we originally envisaged would have cost around one third more and taken three times as long to complete.

With TALO’s approach, we have achieved a far superior quality home with significantly improved insulation and energy performance. This would not have been possible within the constraints of the original structure without compromising the internal space.

From an energy perspective, the house performs brilliantly. With the integrated solar and battery package, we are effectively self-sufficient for most of the day, only drawing electricity from the grid to support EV charging at night in the winter months.

The energy system allows us to closely monitor usage, and the electric underfloor heating solution is both highly cost-effective and maintenance-free compared to traditional wet heating systems. Combined with Passivhaus-level performance, this gives us a home that is not only comfortable but extremely efficient to run.

The build process was equally impressive. The property was watertight in just one week, creating a clean, controlled environment for the internal fit-out. The use of insulation beneath the slab and the overall efficiency of the superstructure installation meant a streamlined build with minimally invasive groundworks.

The project was delivered on time and on budget, supported by a strong partnership between TALO and Oakmont, who clearly understood how to maximise the benefits of the system.

Importantly, the flexibility of the TALO system meant we were able to achieve a fully bespoke design without compromise. This is clearly a highly effective alternative to traditional housebuilding. The combination of speed, cost certainty, performance and design capability has exceeded our expectations, and we would have no hesitation in recommending TALO following our experience
.



Michael Tame, Executive Director, Oakmont Contracting
:

We are really proud of what has been achieved on this project – by the Oakmont team, the client and by TALO. The client was fantastic to work with and enabled us all to collaborate as a genuine partnership.

This was an incredibly tight programme which would not have been possible without the TALO superstructure and foundation systems.


March Hares was Oakmont’s first project with TALO and the outcomes are exceptional.  We delivered this large, five-bedroom home in just 12 weeks from foundations to occupation – which would typically take closer to 35 weeks using traditional housebuilding methods.


We were out of the ground in just seven days using the TALO foundation system – and there was much less waste to landfill. This compares to around four weeks with conventional foundations. The superstructure was then installed in just four days, taking the house to a fully watertight structure in days not weeks.


However, this is not just about programme. The client is delighted with the quality of the build and the running costs for a house of this size are incredibly low. The collaboration with TALO was strong throughout and has again proved it is a really effective approach which we are now using on all of Oakmont’s residential development projects.



lightweight foundation system
factory-installed timber cladding

Images with thanks to C7 Architects